Tuesday, September 9, 2008

Dog Pound Progress

>>>>>>>>>>>>>>>Crane and weathered, unusable rafters
>>>>>>>>>>>Ruined Rafters left out in the weather for months.
>
Went out to the Dog Pound today, Scottsboro/ Jackson County Animal Control Shelter construction project. I had received a tip the rafters that were to be installed on the shelter had been allowed to sit out in the weather for several months and are ruined. A crane was on site to install the rafters. However, after installation, according to the report, the rafters had to be removed due to them being unsuitable for use. What other unsuitable materials have been used? Such a waste of materials, you will notice the many rafters ruined and wasted due to them being left out in the elements apparently for many months.
>>
Apparently the job Foreman did not appreciate me taking pictures and attempted to run me off. I'd say he has something to hide. I requested that he not interfere with me taking pictures. Several inmates, 4-5, were sitting idle enjoying this cool summers day. One was working. I took the two quick photo's and left immediately. I'll be discussing this issue with city officials.
>
Update: The rafter waste will not be charged to the city. The city building inspectors caught the defective trusses and required them to be removed, per Mr. Curtis Davis, City Planner. What was the cost of this building? {$400K+) Thanks to our city inspectors this obvious shoddy construction was averted. No hurry to complete this job as it will allow more convicts to enjoy some time on the outside. How closely and to what frequency is this job site inspected?

Wednesday, March 12, 2008

Animal Control Shelter Progress


Permits have been acquired and construction is underway. Construction is being performed by inmate labor from Alabama Department of Corrections. This results in lower costs for the city. Word has it that an inmate escaped from the site this past week but was recaptured in short order. Previous post about this site for the shelter: http://arklite.blogspot.com/2008/02/animal-control-shelter.html

Tuesday, February 5, 2008

Animal Control Shelter


It looks like this will be the site of the new Animal Control Shelter. This site is between Recycling for Scottsboro and the Scottsboro Police Department Pistol Range. The two previous sites were unsuitable. The site west of the Scottsboro City School Bus Barn was in a low area and would have required considerable fill to have been placed before construction. The other site between the Bus Barn and Recycling for Scottsboro contained a considerable amount of garbage from the 1950's and 60's mixed with fill dirt. That site was considered unsuitable due to the garbage mixed with fill dirt.

The Mayor announced at last nights City Council Meeting that construction will begin on Feb. 11, 2008. Construction will be performed by the Alabama Department of Corrections utilizing inmate labor which will result in decreased costs of construction.

Tuesday, January 8, 2008

Animal Control Shelter Site and Neighbors








The site for the New Animal Control Shelter has apparently been decided. It will be between the "Bus Barn" and "Recycling for Scottsboro" business. Apparently, the other site west of the Bus Barn parking area and Marshall Dr. was to low and would require alot of fill to establish an appropriate foundation elevation (link: http://arklite.blogspot.com/2007/12/around-scottsboro.html ). Clearing has began (see pictures), Mr. Curtis Davis, City Planner, has stated that the building will not conflict with the truck entry and exit from the recycling business owned by Mr. Morris Necklaus. Mr Necklaus and the City of Scottsboro came to an agreement a couple of years back concerning the usage of the old baler facility. The business must remove as a minimum 30,000 pounds of recyclable materials per month per contract requirements from the "garbage stream." Mr. Necklaus has stated to me that he exceeds that amount and averages approximately 50,000 pounds per month of recyclable waste. As Morris pointed out in the comment below, the 30,000 pounds should be 30 tons or 60,000 pounds. The average in weight retrieved is 50 tons, 100,000 pounds. Thanks for that correction.






Mr. Morris Necklaus is pictured working diligently at weighing aluminum cans. Mr. Necklaus is buying aluminum, yesterdays price was 58 cents per pound.
I have added the Animal Control Shelter Site Plan to this post. Note the old baler facility on the left of the plan.