JAMES MADISON QUOTE - 1822

"A popular government without popular information, or the means of acquiring it, is but a Prologue to a Farce or a Tragedy; or, perhaps both. Knowledge will forever govern ignorance; and a people who mean to be their own governors must arm themselves with the power knowledge gives."

SCOTTSBORO WEATHER - SUN & MOON RISE

Showing posts with label DOE. Show all posts
Showing posts with label DOE. Show all posts

Friday, April 15, 2016

Nuclear Regulatory Commission Open house and Public Comment Session onTennessee Valley Authority's Early Site Permit Application for Small Modular Reactors at the Clinch River Site, Oak Ridge, Tennessee - April 12, 2016 (Updated Apr. 16, 2016)

Small Modular Reactor Designs - Fair Use for non-profit news reporting, graphic from http://www.greentechmedia.com/articles/read/Small-Modular-Reactor-Startup-Using-Molten-Salt-Nuclear-Design-Wins-7M-in

"TVA wants to build the small modular reactor (SMR) in an area on the Clinch River near the southwest edge of Oak Ridge.  This is the same site where TVA proposed to build the breeder reactor in the 1980s that was scrapped due to budget cuts and safety concerns." News article with video: http://www.wbir.com/news/local/tva-applying-for-permit-to-build-smaller-nuclear-reactor-in-oak-ridge/112723402

Union of Concerned Scientists - SMR's will not resolve cost, safety and security problems
WASHINGTON (September 26, 2013)—Nuclear power proponents pinning their hopes on small modular nuclear reactors to resurrect the industry’s fortunes will likely be disappointed, according to a report released today by the Union of Concerned Scientists (UCS). The report, Small Isn’t Always Beautiful, concludes it will be extremely difficult for small reactors—which are less than a third the size of a standard 1,000-megawatt nuclear reactor—to generate less expensive electricity and, at the same time, be safer than their larger cousins.

“Nuclear safety and security don’t come cheap,” said UCS Senior Scientist Edwin Lyman, the author of the report. “A utility that thinks it can have its own little nuclear reactor at a bargain-basement price may get exactly what it pays for: a plant more vulnerable to serious accidents and terrorist attacks.” http://www.ucsusa.org/news/press_release/small-modular-nuclear-reactor-0404.html#.VxFoPZX2bIV

BREDL/BEST/MATRR
On April 12 from 1 p.m. to 4 p.m. members of the Bellefonte Efficiency and Sustainability Team/Mothers Against Tennessee River Radiation (BEST/MATRR), a local chapter of the Blue Ridge Environmental Defense League (BREDL) attended the open house and information session. We conducted interviews with TVA Clinch River Project Manager, Dan Stout, and the Attorney with the Tennessee Sierra Club, Brian Paddock. The information session was held at the Pollard Center on the campus of Oak Ridge Associated Universities, Oak Ridge Tennessee.

SafeCast Ionizing Radiation Monitoring at Oak Ridge and Environs - 
High Count per Minute was 46cpm, low was 18cpm. The B-geigy Monitor was mounted on the right side of the vehicle 1 meter from ground level. Counts Per Minute (cpm) were within normal background radiation parameters for the area.

VIDEOS

Introductory Video


Interview with Dan Stout, TVA Project Manager, Clinch River SMR Site


Interview with Brian Paddock, Esq., Attorney with the Tennessee Sierra Club


NRC Explanation of Early Site Permit Process, selected segments.


Citizen Comments, Questions and Concerns, selected segments.


NRC VIDEO on SMR's - Nov 13, 2014



TVA Slide Show on SMR's http://www.slideshare.net/orau/stout-tva-day-1-panel-1


DOE on SMR's http://www.energy.gov/ne/nuclear-reactor-technologies/small-modular-nuclear-reactors

Small Modular Reactors Not Likely Before 2020  http://oakridgetoday.com/2016/04/13/small-nuclear-reactors-not-likely-before-mid-2020s/

NRC - Tennessee Valley Authority Clinch River Site Early Site Permit Application 
Tennessee Valley Authority (TVA) intends to submit an Early Site Permit Application (ESPA) for two or more small modular reactor (SMR) modules (up to 800 MWe, 2420 MWt) at the Clinch River Nuclear (CRN) site to the NRC for review in the second quarter of NRC fiscal year (FY) 2016 (first quarter of calendar year (CY) 2016). The application will use the Plant Parameter Envelope (PPE) approach, by which an applicant provides sufficient bounding parameters and characteristics of the reactor or reactors, and the associated facilities, so that assessments of site safety and environmental suitability can be made by NRC.

For additional information, please use the Advanced Web Search feature of our Agencywide Documents Access and Management System (ADAMS), and enter PROJ0785 in the "Docket Number" field.
For additional detail, see the following topics on this page:
 http://www.nrc.gov/reactors/advanced/clinch-river.html

                                BREDL FACT SHEET ON SMR's
                        Click on image for an expanded view.)

Complaint to the Nuclear Regulatory Commission OIG for violation of the Federal Sunshine in Government Act. 
The NRC held a separate meeting for public officials at 9AM on April 12, 2016. This separate meeting makes no sense, since the only information to be presented is allegedly public information. The separate meeting effectively isolates public officials from the public. The NRC General counsel has confirmed receipt of this complaint.

COMPLAINT TEXT
NRC OIG Complaint – 4-8-16 
Subject: Separate Meeting for public officials Regarding SMR Project.
From: Garry Morgan, Scottsboro, Alabama


Violation of Government in the Sunshine Act Pub.L. 94–409, 90 Stat. 1241, 5 U.S.C. § 552b - Regarding holding a separate meeting, secret meeting, with local public officials, outside of a public meetings scheduled on April 12, 2016 - Reference NRC Public Affairs Notice 16-016, regarding Small Modular Reactors at the Clinch River Site near Oak Ridge, Tn. There is no mention of the separate secret meeting in the official notice with public officials which is scheduled on 4-12-16 at 9AM, location Hilton Hotel or Pollard Auditorium, per "un-named" (names redacted, confirmed from 2 separate officials) NRC Officials.


Although this is not a deliberation of the Nuclear Regulatory Commission it is a Public Meeting as scheduled and there will be many different public officials from various public entities attending this secret meeting for public officials which is allegedly to discuss the same information to be presented at the afternoon and evening public meetings in the described NRC meeting announcement. 


Why a secret meeting prior to the regularly scheduled meeting? Could it be there are site problems or other problems which the DOE, NRC, TVA does not want the public to know about? Are there secret site plans which federal and local officials will consider which the various federal agencies involved do not want the public atlarge to be aware? Surely all involved want to hear public comments - why would a federal agency move to isolate public officials from the public? Is there a need for secrecy involving what should be public information? 


The legislative intent of the Sunshine Act is as follows: "The basic premise of the sunshine legislation is that, in the words of federalist No. 49, 'the people are the only legitimate foundation of power, and it is from them that the constitutional charter ... is derived.' Government is and should be the servant of the people, and it should be fully accountable to them for the actions which it supposedly takes on their behalf." (U.S.C.C.A.N. 2183, 2186).


The NRC's intentional isolation of various government officials from the public in a separate meeting violates the very spirit and intent of the United States of America's Federal Sunshine in Government Act. Many items discussed in these public meetings will be deliberated on at a later date in various governmental entities. 


It is vitally important that all government officials hear all public input, not just the input from federal officials and contractors connected with the Small Modular Reactor Projects. Holding a separate public officials meeting isolates public officials from the electorate, taxpayers and ratepayers, the stakeholders which the NRC are supposed to protect. 


Isolation of public officials from the public in a separate secret meeting for public officials does not facilitate open government as described in the Federal Sunshine Act and does not display
your role as the regulator in a positive light, the isolation of public officials by holding a separate meeting for public officials violates the intent of the Federal Sunshine Act.


I am asking the NRC OIG to initiate action to stop any separate meeting which isolates public officials from the public in NRC Public Meetings.

Saturday, December 20, 2014

Yucca Mountain Nuclear Waste Repository - Department of Energy Failure, Gross Negligence and Corruption?

Fair Use Rights for educational and news reporting, and criticism for wasting $14 billion dollars.

The big dark financial hole - YUCCA MOUNTAIN NUCLEAR WASTE REPOSITORY  was it, is it the biggest financial scam in Department of Energy's history??  

What is Yucca Mountain and why does a place warrant me calling Department of Energy, DOE, grossly negligent, wasteful, corrupt or a combination of all of the above? The following information is from Power Magazine and Wikipedia, references are listed and have been reviewed, they are accurate. Fair Usage Rights for education and news reporting. Creative Commons License Reference  CC BY-SA 3.0

Power Magazine had this to say about DOE and Yucca Mountain regarding the NRC's position and finding either approving or disapproving of the nuclear waste repository: NRC statement: "Specifically, DOE has not acquired ownership or jurisdiction over the land where the geologic repository operations area would be located, and the land is not free of significant encumbrances such as mining rights, deeds, rights-of-way or other legal rights. DOE also has not acquired water rights it determined are needed to accomplish the purpose of the geologic repository operations area.” NRC quote -  "The NRC staff finds that DOE has not met the requirements 10 CFR 63.121(a) and 10 CFR 63.121(d)(1) regarding ownership of land and water rights, respectively."

"NRC in November 2013 directed staff to finish the long-delayed SER, the key technical document of the NRC’s review of the Yucca Mountain application. It is to be published in five volumes."

"Volume 1 (General Information) was published in August 2010, and Volume 3 (Repository Safety After Permanent Closure) was issued this October. Volume 2 (Repository Safety Before Permanent Closure) and Volume 5 (License Specifications) will be published by the end of January 2015, as they are completed, the NRC said."

 "  Volume 4 (Administrative and Programmatic Requirements) of the five-part SER, documents the NRC staff’s evaluation to determine whether the DOE’s research and development, and performance confirmation programs, as well as other administrative controls, systems, and programs, meet applicable NRC requirements."
http://www.powermag.com/nrc-doe-does-not-meet-land-ownership-water-rights-requirements-for-yucca-mountain-site/
NRC Reference - "The NRC staff finds that DOE has not met the requirements 10 CFR 63.121(a) and 10 CFR 63.121(d)(1) regarding ownership of land and water rights, respectively." http://www.nrc.gov/reading-rm/doc-collections/nuregs/staff/sr1949/v4/
Land ownership and control - http://www.nrc.gov/reading-rm/doc-collections/cfr/part063/part063-0121.html

Reference court order - In August 2013, the U.S. Court of Appeals for the District of Columbia ordered the Nuclear Regulatory Commission to either "approve or reject the Energy Department's application for [the] never-completed waste storage site at Nevada's Yucca Mountain."[77]   From Wikipedia: http://en.wikipedia.org/wiki/Yucca_Mountain_nuclear_waste_repository

                                                MAP
Fair Use Rights for map: CC BY-SA 3.  Finlay McWalter - USGS Topo maps GIS data in NASA World Wind NationalAtlas Dreamland resort Groom Lake Desert Rat Glenn Campbell FAA Aeronautical chart Wikipedia maps of Nevada and the western USA Nevada DOT air transportation map  (click on map for an expanded view)

"Arrogance of the Federal Government... handling of the project was wrong."



LESSONS LEARNED FROM YUCCA MOUNTAIN

Yucca Mountain nuclear waste repository


"The Yucca Mountain Nuclear Waste Repository, as designated by the Nuclear Waste Policy Act amendments of 1987, is to be a deep geological repository storage facility for spent nuclear reactor fuel and other high level radioactive waste. Federal funding ended in 2010 but is expected to start again in 2015 with the new Republican Congress. [2] It is located on federal land adjacent to the Nevada Test Site in Nye County, Nevada, about 80 mi (130 km) northwest of the Las Vegas Valley. The proposed repository is within Yucca Mountain, a ridge line in the south-central part of Nevada near its border with California." 

Spent nuclear fuel is the radioactive by-product of electric power generation at commercial nuclear power plants, and high-level radioactive waste is the by-product from reprocessing spent fuel to produce fissile material for nuclear weapons.[6] In 1982, the United States Congress established a national policy to solve the problem of nuclear waste disposal. This policy is a federal law called the Nuclear Waste Policy Act,[7] which made the U.S. Department of Energy responsible for finding a site, building, and operating an underground disposal facility called a geologic repository. The recommendation to use a geologic repository dates back to 1957 when the National Academy of Sciences recommended that the best means of protecting the environment and public health and safety would be to dispose of the waste in rock deep underground.[8]

The Department of Energy began studying Yucca Mountain in 1978 to determine whether it would be suitable for the nation's first long-term geologic repository for over 70,000 metric tons (69,000 long tons; 77,000 short tons) (150 million pounds) of spent nuclear fuel and high-level radioactive waste currently stored at 121 sites around the nation. An estimated 10,000 metric tons (9,800 long tons; 11,000 short tons) of the waste would be from America's military nuclear programs.[9] On December 19, 1984, the Department of Energy selected ten locations in six states for consideration as potential repository sites. This was based on data collected for nearly ten years. The ten sites were studied and results of these preliminary studies were reported in 1985. Based on these reports, President Ronald Reagan approved three sites for intensive scientific study called site characterization. The three sites were Hanford, Washington; Deaf Smith County, Texas; and Yucca Mountain. In 1987, Congress amended the Nuclear Waste Policy Act and directed DOE to study only Yucca Mountain, which is already located within a former nuclear test site. The Act provided that if during Site Characterization the Yucca Mountain location is found unsuitable, studies will be stopped immediately. This option expired when the site was actually recommended by the President. On July 23, 2002, President

George W. Bush signed House Joint Resolution 87,[10] (Pub.L. 107–200) allowing the DOE to take the next step in establishing a safe repository in which to store the country's nuclear waste. The Department of Energy was to begin accepting spent fuel at the Yucca Mountain Repository by January 31, 1998 but did not do so because of a series of delays due to legal challenges, concerns over how to transport nuclear waste to the facility, and political pressures resulting in underfunding of the construction.

On July 18, 2006 the DOE proposed March 31, 2017 as the date to open the facility and begin accepting waste based on full funding. On September 8, 2006 Ward (Edward) Sproat, a nuclear industry executive formerly of PECO energy in Pennsylvania, was nominated by President Bush to lead the Yucca Mountain Project. Following the 2006 mid-term Congressional elections, Democratic Nevada Senator Harry Reid, a longtime opponent of the repository, became the Senate Majority Leader, putting him in a position to greatly affect the future of the project. Reid has said that he would continue to work to block completion of the project, and is quoted as having said: "Yucca Mountain is dead. It'll never happen."[11]


(click on diagram for an expanded view)

Fair Use Rights, image is in the Public domain: Unless otherwise indicated, this information has been authored by an employee or employees of the University of California, operator of the Los Alamos National Laboratory under Contract No. W-7405-ENG-36 with the U.S. Department of Energy. The U.S. Government has rights to use, reproduce, and distribute this information. The public may copy and use this information without charge, provided that this Notice and any statement of authorship are reproduced on all copies. Neither the Government nor the University makes any warranty, express or implied, or assumes any liability or responsibility for the use of this information.



MASSIVE COSTS AND BUDGET PROBLEMS

In the 2008 Omnibus Spending Bill, the Yucca Mountain Project's budget was reduced to $390 million. Despite this cut in funding, the project was able to reallocate resources and delay transportation expenditures to complete the License Application for submission on June 3, 2008. Lacking an operating repository, however, the federal government owes to the utilities somewhere between $300 and $500 million per year in compensation for failing to comply with the contract it signed to take the spent nuclear fuel by 1998.[12]

During his 2008 presidential campaign, Barack Obama promised to abandon the Yucca Mountain project and as a result Senator Reid moved the Nevada primary to help Obama's campaign.[13] After his election, the Nuclear Regulatory Commission told Obama he did not have the ability to do so.[14] On April 23, 2009, Lindsey Graham (R-South Carolina) and eight other senators introduced legislation to provide "rebates" from a $30 billion federally managed fund into which nuclear power plants had been paying, so as to refund all collected funds if the project was in fact cancelled by Congress.[15]

In November 2013, in response to a lawsuit filed by the National Association of Regulatory Utility Commissioners (NARUC) and the Nuclear Energy Institute (NEI), the US Court of Appeals ruled that nuclear utilities may stop paying into the nuclear waste recovery fund until either the DOE follows the Nuclear Waste Policy Act which designates Yucca Mountain as the repository, or Congress changes the law.[16] The fee ended May 16, 2014.

In 2008, the U.S. Senate Committee on Environmental and Public Works found that failure to perform to contractual requirements could cost taxpayers up to $11 billion by 2020.[79] In 2013 this estimate of taxpayer liability was raised to $21 billion.[80] In July 2009, the House of Representatives voted 388 to 30 on amendments to HHR3183 (Roll call vote 591, via Clerk.House.gov) to not defund the Yucca Mountain repository in the FY2010 budget.[29][81] In 2013, the House of Representatives voted twice during the 2014 Energy and Water Appropriations debate by over 80% majority to reject elimination of Yucca Mountain as the nation's only nuclear waste solution.[82]

On April 13, 2010, the state of Washington filed suit to prevent the closing of Yucca Mountain, since this would slow efforts to clean up Hanford Nuclear Reservation.[83] South Carolina, Aiken County (the location of Savannah River site) and others joined Washington.[84] The United States Court of Appeals for the District of Columbia Circuit dismissed the suit in July 2011, saying the Nuclear Regulatory Commission had not ruled on the withdrawal of the license application.[85] Washington and South Carolina filed another lawsuit on July 29.[86]

With $32 billion received from power companies to fund the project, and $12 billion spent to study and build it, the federal government had $27 billion left, including interest. In March 2012, Senator Lindsey Graham introduced a bill requiring three-fourths of that money to be given back to customers, and the remainder to the companies for storage improvements.[87]

In August 2013, the U.S. Court of Appeals for the District of Columbia ordered the Nuclear Regulatory Commission to either "approve or reject the Energy Department's application for [the] never-completed waste storage site at Nevada's Yucca Mountain."[77] The court opinion said that the NRC was "simply flouting the law" in its previous action to allow the Obama administration to continue plans to close the proposed waste site since a federal law designating Yucca Mountain as the nation's nuclear waste repository remains in effect. The court opinion stated that "The president may not decline to follow a statutory mandate or prohibition simply because of policy objections."[77]

UNETHICAL CONDUCT - (official government document, Fair Use) Department of Energy: Unethical Conduct at DOE's Yucca Mountain Project (Letter Report, 09/30/96, GAO/OSI-96-2). Pursuant to a congressional request, GAO investigated allegations of conflicts of interest at the Department of Energy's (DOE) Yucca Mountain Project, focusing on whether: (1) the DOE Office of Civilian Radioactive Waste Management (OCRWM) properly implemented and adequately enforced federal standards of ethical conduct and DOE ethics regulations; and (2) failure to implement DOE ethics standards may have contributed to contract award and management abuses. 

GAO found that: (1) the two most senior DOE officials on the project, as well as 14 other DOE employees, had personal relationships with employees of Science Applications International Corporation (SAIC), the project's largest single contractor; (2) the relationships of the two senior officials were in violation of an executive order and DOE regulations because they created at least the appearance of a loss of impartiality; (3) although in some cases OCRWM and other project officials knew for years that potential ethical problems existed at the project, they did not take formal action until 1993, when OCRWM issued a memorandum about federal-contractor employee relationships, provided ethics training, and determined whether DOE employees in such relationships required a recusal or waiver to ensure impartiality; and (4) one of the senior officials also acted questionably in terms of presenting his own positions about the project to Congress without management approval, influencing the hiring of a subcontractor, opposing a contract that would have reduced SAIC work, and inappropriately lobbying Congress and attending congressional meetings with the contractor. GAO REPORT ON UNETHICAL CONDUCT - YUCCA MOUTAIN

SUMMARY
A failure to acquire land usage rights and/or ownership rights, including water rights represents unbelievable ignorance or negligence, maybe both, as displayed by Department of Energy's actions regarding the Yucca Mountain Project. This incident, coupled with recent security failures and leaks in Department of Energy storage facilities represents negligent conduct on the part of agency managers, These facts bring into question whether this agency should be handling nuclear materials, much less managing programs involving nuclear materials. There appear to be serious leadership problems within Department of Energy.

After all the work, billions of dollars spent, the DOE does not own the land or have usage rights of the land; therefore, the NRC should not issue a license to operate the Yucca Mountain Nuclear Waste Depository facility.

This question must be asked - was this project designed to fail and only reap benefits for contractors?


List of Yucca Mountain Archival Documents - DOE  http://energy.gov/list-yucca-mountain-archival-documents

Partial List of Legal Actions from Yucca Mountain.org http://www.yuccamountain.org/lawsuites_press05.htm#